Soundfangled designs and delivers sound system installation and wider AV systems for venues, workplaces, hospitality and cultural spaces. Each system is planned around the room, its operators and the way it needs to work.
Production, AV Systems & Installations and Acoustics & Environmental Design share one planning approach. When a brief crosses a live event, a permanent system and the room itself, the technical responsibility stays with one team.
AV systems & installationsPrimary
AV systems and installations
Soundfangled AV Systems & Installations specifies, installs, commissions and hands over AV systems for venues, workplaces, cultural spaces and event operators.
Soundfangled Production manages technical planning, budget control, crew, supplier coordination and show delivery for live environments where risk needs active management.
Audio, video, lighting and control, specified together.
Audio, video, lighting, controls and infrastructure are specified as one operational system. Survey, installation, commissioning, documentation and staff handover remain connected to the original brief.
Installed audio systems are specified around the room, operator and ongoing use case, with coverage, source control, calibration and maintainability considered from the start.
Sound system specification
Coverage and calibration
Operator handover
02 / Discipline
Video systems
Video systems cover display, routing, source management and practical operator workflows for venues, workplaces, hospitality and cultural spaces.
Display and routing design
Source and signal management
User-ready operation
03 / Discipline
Lighting systems
Lighting systems are planned as part of the built environment, from architectural and event-use lighting to control interfaces that staff can operate with confidence.
Architectural and event lighting
Control integration
Scene setting
04 / Discipline
Control systems
Control systems bring audio, video, lighting and room behaviours into clear interfaces, reducing operational friction for front-of-house, technical and venue teams.
Control interface design
System automation
Staff-ready workflows
05 / Discipline
Staging & infrastructure
Infrastructure work covers the hidden technical layer: racks, cable paths, networked signal routes, power coordination and documentation that make systems supportable after handover.
Racks and technical spaces
Cable and network routes
Handover documentation
Integrated AV workflows
Permanent and temporary systems planned around the room, operator and handover.
Planning, systems, crew and delivery in one controlled workflow.
Soundfangled handles technical advance, signal architecture, crew coordination and handover for permanent or temporary AV environments.
01 / PLAN
Technical advance
Site surveys, technical schedules, access planning and risk coordination before equipment, crew or contractors arrive.
02 / SPEC
Signal architecture
CAD layouts, signal-path mapping and system choices specified around the room, operator and commercial use case.
03 / CREW
Accountable crew
AV engineers, contractors and specialist crew working from one joined-up plan instead of disconnected supplier notes.
04 / LIVE
Delivery and handover
System commissioning, calibration, room checks and handover information that help teams keep using the work after installation day.
Survey, design, specification, installation, commissioning, calibration and handoff, plus coordination with contractors and internal teams where the project requires it.
Room use, coverage, speech versus music requirements, operator confidence, maintenance access and future expansion are fixed before speakers and amplification are specified.
When room behaviour affects the brief, such as noise break-out, reverberation or compliance, AV system design and acoustic consultancy should be planned together. Acoustics handles room and compliance depth; AV Systems handles specified infrastructure and handoff.
Yes. Documentation, commissioning records and staff briefings are part of delivery, so architects, contractors and in-house teams work from the same record of the installed system.
Straightforward equipment hire is supported through a secondary operational route. Specified systems, installation and commissioning belong on this pathway.